There are a number of reports that utilize the information you entered into the scheduler.  Those reports are as follows:

 

  1. OSS Inspection Reports (Blank): By Date Range

    This report will provide all of the blank inspection checklists for septic inspections due between the date range provided.  If the components are not setup on a site, then the blank checklist will not have inspection information.

  2. Inspections Due: OSS Inspections, OSS Sampling, and Tank Pumping (Start Date Optional)

    This report will provide the "next" event due for the respective report.