There are a number of reports that utilize the information you entered into the scheduler. Those reports are as follows:
- OSS Inspection Reports (Blank): By Date Range
This report will provide all of the blank inspection checklists for septic inspections due between the date range provided. If the components are not setup on a site, then the blank checklist will not have inspection information. - Inspections Due: OSS Inspections, OSS Sampling, and Tank Pumping (Start Date Optional)
This report will provide the "next" event due for the respective report.